Durgam Cheruvu Cable Bridge in Hyderabad

The Durgam Cheruvu Cable-stayed Bridge is an extravagant bridge in Hyderabad in Telangana, India, a marvel of architectural ingenuity. This engineering masterpiece is a vital artery connecting Jubilee Hills to the financial district, near the Inorbit Mall in Madhapur. Beyond the structural beauty of the bridge, it reduces vehicular congestion and streamlines traffic in the serene stretch of Durgam Cheruvu.

Durgam Cheruvu Cable Bridge

  • Length: 233 meters (764 ft)
  • Lanes: 6
  • Cost: ₹184 crore
  • Opened: 25 September 2020

With the rapid establishment of IT hubs and commercial centers around HITEC City and Gachibowli, the construction of the Durgam Cheruvu Cable Bridge is a strategic initiative to ease traffic bottlenecks. This infrastructure effort aims to enhance road connectivity while balancing the growing passenger demand in the region.

The large central span of 233.85 m is the hallmark of the bridge. It was carefully designed so that any structural intrusion did not harm the ecology of the lake. The bridge emphasizes sustainable development and is linked to environmental conservation. Its extradosed cable-stayed design has a span configuration of 96 m + 233.85 m + 96 m, supported by two sturdy pylons on opposite sides of the lake.

The bridge has a viaduct on one side, consisting of precast segmental concrete (PSC) box girders, each 30 meters long. The deck has a six-lane traffic system, allowing uninterrupted vehicular movement, while there are footpaths on both sides for pedestrians, which are not meant for motorized ones.

The structural design of the bridge brings together both beauty and functionality. Everything has been thoughtfully designed to enhance the visual appeal of the bridge and the surrounding rugged Cheruvu lake. The bridge, seamlessly combining utility and architectural beauty, makes the area a focal point for tourism, adding to the scenic charm of the area.

Specifications

  • The Cheruvu Cable Bridge solves traffic problems in Hyderabad, reducing travel time between Madhapur and Jubilee Hills from 40 minutes to 10 to 15 minutes. Apart from easing vehicular movement, this feat of modern engineering has become a symbol of infrastructure progress in the region.
  • The maximum speed of vehicles is 35 kmph to ensure safety and smooth traffic on the bridge. The bridge carries traffic from Road No. 45 directly onto its span, which has a four-lane elevated corridor.
  • The bridge was built in a remarkably short period of 22 months, a blend of innovation and precision. While most of the materials were procured locally, high-performance cables were imported from Germany, reflecting the careful attention to quality. 287 metric tonnes of stay cables, 4,800 metric tonnes of steel, 26,600 cubic metres of concrete and 420 metric tonnes of high-tension strands were used in the construction.
  • The 233m long and 25.8 m wide cable-stayed section is supported by 52 stay cables, adding to both its strength and beauty. The approach viaduct and solid ramp extends to 309.8 m to seamlessly integrate the structure into the surrounding road network. Footpaths constructed on each side at a distance of 1.9 m facilitate pedestrian movement.
  • This engineering marvel is carefully designed to strike a balance between beauty and functionality, making it a striking element in architecture. The Durgam Cheruvu Cable Bridge is a testament to modern urban planning and development, by using advanced construction techniques and incorporating sustainable practices.

Anil Agarwal is a Senior Content Writer at infrainfohub.com. With a passion for Infrastructure, he enjoys crafting engaging and informative content in this field. Anil's expertise lies in writing articles, reviews, and features that captivate readers and keep them informed about the latest trends and news in the Infrastructure sector. His dedication to delivering high-quality content makes her a valuable asset to the team at infrainfohub.com.

Leave a Comment