Categories: Roads

Samruddhi Mahamarg Update: Final Stretch Spanning 76-Km Set To Open By November

Maharashtra State Road Development Corporation (MSRDC) plans to open the remaining portion of Samruddhi Mahamarg in November.

Samruddhi Mahamarg, a highway connecting Nagpur to Mumbai is 701 km long and is currently open from Nagpur to Igatpuri city.

The last 76 km stretch under construction between Igatpuri and Amane village in Thane, which will connect to Mumbai, will partially open by August.

“We have completed nearly 90 percent of the work, with the 1.8 km Khardi bridge on the Kasara ghat section posing the main challenge. The 8-km-long tunnel is complete. While the expressway is six lanes, it will temporarily narrow to four lanes at the Khardi bridge for the time being,” a senior MSRDC official told the Free Press Journal.

“The entire expressway has three lanes on each side. The traffic to Mumbai will start by August and only the bridge stretch will have a four-lane road with two lanes being operational in either direction. This would be a temporary arrangement and we have plans to open the remaining lanes of the bridge for traffic by November, thereby making operational the entire expressway a six-lane project,” the official added.

This 701 km long expressway, which connects winter capital Nagpur from Thane district to financial hub Mumbai, is formally called the Hindu Hriday Samrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg.

Currently, it is the longest highway in the country; It crosses 10 major districts and indirectly connects 14 other districts, connecting the eastern part of Maharashtra with the western part, which is economically important.

The expressway, connecting important economic hubs including Jawaharlal Nehru Port in Mumbai, the country’s largest container port, and the upcoming international airport in Navi Mumbai is called the “Samruddhi Mahamarg”.

The Maharashtra government has proposed to build additional connectors or access-controlled expressways to connect major districts to the Samruddhi Mahamarg.

MSRDC has started construction of the Jalna-Nanded Expressway, which is 179.85 km long. Not only this, the agency has issued two additional bids for the construction of Nagpur-Gondia and Nagpur-Chandrapur Expressways.

These three expressways will be connected to the Mumbai-Nagpur Samruddhi Mahamarg, which will increase road travel connectivity between Mumbai and remote areas of the state.

Anil Agarwal

Anil Agarwal is a Senior Content Writer at infrainfohub.com. With a passion for Infrastructure, he enjoys crafting engaging and informative content in this field. Anil's expertise lies in writing articles, reviews, and features that captivate readers and keep them informed about the latest trends and news in the Infrastructure sector. His dedication to delivering high-quality content makes her a valuable asset to the team at infrainfohub.com.

Recent Posts

China Successfully Completes Maglev Train Trail Run With 1000 Kph Speed

In a landmark event, China has triumphantly executed a demonstration of its ultra-high-speed (UHS) maglev…

12 hours ago

Navi Mumbai International Airport to be fully Operational in March 2025

The Navi Mumbai International Airport (NMIA) will land its first aircraft on a trial basis…

13 hours ago

Bengaluru-Chennai Expressway Set to Fully Operational by August 2025

Union Road Transport Minister Nitin Gadkari recently announced that the Bengaluru-Chennai Expressway will be inaugurated…

3 days ago

Delhi Gurgaon Expressway Route, Map, Toll and More

The Delhi Gurgaon Expressway opened in 2008 and became a major transportation threat between Delhi…

3 days ago

Darbhanga Anand Vihar Amrit Bharat Express Ticket Fares, Stations and More

Railway officials said that these trains have aerodynamic engines. Amrit Bharat Express has attractive brown…

3 days ago

Surat Outer Ring Road: Phase 2 Set to Begin After Diwali

The outer ring road being built around Surat was planned to have 27.77 km of…

3 days ago