Categories: Railways

J&K: Indian Railways Conducts Trial Run On World’s Highest Railway Bridge – The Chenab Railway Bridge

The Indian Railways successfully conducted a trial run of an eight-coach MEMU train on the world’s highest railway bridge, the Chenab Rail Bridge, in Jammu and Kashmir.

This arch bridge, situated 1,178 feet above the river bed between Bakkal and Kauri in Reasi district, forms a vital bridge between Katra and Banihal.

“After a comprehensive inspection of the newly constructed Chenab Bridge by senior officials of Railway Board, Northern Railway, and Konkan Railway, a trial run was conducted at a speed of 40 kmph on the 46-km long electrified line section between Sangaldan and Reasi in Ramban district,” the Railway Ministry said.

The trial run started from Sangaldan at 12:35 pm and successfully reached Reasi at 2:05 pm. The route passes through nine tunnels on the way, with a total length of 40.787 km, with the longest being the T-44 tunnel at 11.13 km.”

Indian Railways had earlier successfully trialed the engine on this marvelous engineering device on Sunday, June 16.

Union Railway Minister Ashwini Vaishnaw announced the successful electric engine trial in a post on X.

The Iconic Chenab Bridge, with a total length of 1,315 m and an arch span of 467 m, is built at 359 m (1,178 ft) over the Chenab River. It is the world’s highest arch railway bridge, 35 m higher than the Eiffel Tower in Paris.

The bridge is crucial to the Rs 35,000 crore Udhampur-Srinagar-Baramulla Railway Link (USBRL) project.

The resumption of rail services on the 46-km long Sangaldan-Reasi section comes after a successful trial run on the bridge, which is a crucial part of the USBRL project.

“After several such trials, the bridge will be opened for all rail services, which will be a significant step towards seamlessly connecting the Kashmir Valley with Jammu and the wider Indian landscape,” the ministry said.

“This will promote social integration by facilitating easy movement of people and goods, thereby promoting cultural exchange and regional development and boosting economic activities such as tourism and trade,” the ministry said.

Indian Railways has laid a 272 km long railway line from Udhampur to Baramulla under the USBRL project, providing an alternative and reliable transportation system to Jammu and Kashmir.

Amit Kumar

Amit Kumar is a Content Writer at infrainfohub.com. Amit's expertise lies in writing articles, reviews, and features that captivate readers and keep them informed about the latest trends and news in the Infrastructure sector. His dedication to delivering high-quality content makes her a valuable asset to the team at infrainfohub.com.

Recent Posts

China Successfully Completes Maglev Train Trail Run With 1000 Kph Speed

In a landmark event, China has triumphantly executed a demonstration of its ultra-high-speed (UHS) maglev…

1 day ago

Navi Mumbai International Airport to be fully Operational in March 2025

The Navi Mumbai International Airport (NMIA) will land its first aircraft on a trial basis…

1 day ago

Bengaluru-Chennai Expressway Set to Fully Operational by August 2025

Union Road Transport Minister Nitin Gadkari recently announced that the Bengaluru-Chennai Expressway will be inaugurated…

4 days ago

Delhi Gurgaon Expressway Route, Map, Toll and More

The Delhi Gurgaon Expressway opened in 2008 and became a major transportation threat between Delhi…

4 days ago

Darbhanga Anand Vihar Amrit Bharat Express Ticket Fares, Stations and More

Railway officials said that these trains have aerodynamic engines. Amrit Bharat Express has attractive brown…

4 days ago

Surat Outer Ring Road: Phase 2 Set to Begin After Diwali

The outer ring road being built around Surat was planned to have 27.77 km of…

4 days ago