Categories: RailwaysTransport

Atlanta MARTA Metro – Route, Map, Fare, Schedules and More

MARTA is the major public transportation operator in the Atlanta metropolitan area. Created in 1971 as a strict bus system, MARTA runs a network of bus routes connected by 48 miles (77 km) of rail track with 38 subway stations. MARTA is the eighth-largest rapid transit system in the United States by ridership.

MARTA operates almost entirely in Fulton, Clayton, and DeKalb counties. However, they retain bus services to two destinations in neighboring Cobb County, such as Six Flags Over Georgia and the Cumberland Transfer Center next to the Cumberland Mall. MARTA also offers Mobility, a paratransit service for customers with disabilities, through the Doraville Station Ride Gwinnett buses.

Atlanta Metro Overview

  • Length: 48 mi (77 km)
  • Stations: 38
  • Lines: 4
  • Track gauge: 4 ft 8+1⁄2 in (1,435 mm)
  • Speed: 70 mph (110 km/h)
  • Owner: Metropolitan Atlanta Rapid Transit Authority (MARTA)
  • Operator: Metropolitan Atlanta Rapid Transit Authority (MARTA)
  • Started Date: February 17, 1972

Atlanta Metro Route

MARTA Rail is a 48-mile, 77-kilometer-long metro system in Atlanta, Georgia, with 38 stations and four lines (Red, Gold, Blue, and Green).

The Red and Gold lines are in a north-northeast alignment, while the Blue and Green lines are in an east-west alignment. Five Points station, the only station on the network that allows users to transfer to any line, connects to all four lines.

Atlanta MARTA Operational Metro Lines

Red Line

  • Route: North Springs – Atlanta Airport
  • Stations: 19

Stations List: Airport, College Park, East Point, Lakewood / Fort McPherson, Oakland City, West End, Garnett, Five Points, Peachtree Center, Civic Center, North Avenue, Midtown, Arts Center, Lindbergh Center, Buckhead, Medical Center, Dunwoody, Sandy Springs, North Springs

Gold Line

  • Route: Doraville – Airport
  • Stations: 18

Stations List: Stations: Airport, College Park, East Point, Lakewood / Fort McPherson, Oakland City, West End, Garnett, Five Points, Peachtree Center, Civic Center, North Avenue, Midtown, Arts Center, Lindbergh Center, Lenox, Brookhaven/Oglethorpe, Chamblee, Doraville

Blue Line

  • Route: Hamilton E. Holmes – Indian Creek
  • Stations: 15

Stations List: Hamilton E. Holmes, West Lake, Ashby, Vine City, Dome / GWCC / Philips Arena / CNN Center, Five Points, Georgia State, King Memorial, Inman Park / Reynoldstown, Edgewood / Candler Park, East Lake, Decatur Avondale, Kensington, Indian Creek

Green Line

  • Route: Bankhead  – Edgewood / Candler Park
  • Stations: 9

Stations List: Bankhead, Ashby, Vine City, Dome / GWCC / Philips Arena / CNN Center, Five Points, Georgia State, King Memorial Inman Park / Reynoldstown, Edgewood / Candler Park

Atlanta MARTA Metro Route Map

Atlanta MARTA Metro Ticket Prices (Fare)

MARTA’s one-way fare is currently $2.50. New Breeze cards are $2. Breeze Tickets carry an extra fee of $1 for single-use only. Passengers over 65, passengers with disabilities, and Medicare recipients will receive a discounted fare of one dollar. One-way paratransit fares are four dollars. Ten full-fare one-way trips can be $25, and twenty full-fare trips can be $42.50. 

MARTA also offers several transit pass options for unlimited travel: a 24-hour pass is $9, a 2-day pass is $14, a 3-day pass is $16, a 4-day pass is $19, a 7-day pass is $23.75, and a 30-day pass is $95.

  • Regular Fare (one-way trip): $2.50
  • Children (46 inches and under): Free
  • Senior Citizens, Disabled Riders & Medicare Recipients: $1.00

Atlanta MARTA Metro Hours (Timing)

Train Hours

  • Weekday: 4:45 AM – 1 AM
  • Weekend: 6 AM – 1 AM

Train Frequency

  • Rush Hours: 20 min (6-9 AM & 3-7 PM)
  • Non-Rush Hour: 20 min
  • Nights & Weekends: 20 min
James

James Paul is a Author at infrainfohub.com, specializing in the realms of worldwide infrastructure news. With a passion for all things infrastructure-related, James dedicates himself to providing insightful and engaging content to his readers. James knack for writing captivating articles makes him an invaluable asset to the team at infrainfohub.com.

Recent Posts

China Successfully Completes Maglev Train Trail Run With 1000 Kph Speed

In a landmark event, China has triumphantly executed a demonstration of its ultra-high-speed (UHS) maglev…

1 day ago

Navi Mumbai International Airport to be fully Operational in March 2025

The Navi Mumbai International Airport (NMIA) will land its first aircraft on a trial basis…

1 day ago

Bengaluru-Chennai Expressway Set to Fully Operational by August 2025

Union Road Transport Minister Nitin Gadkari recently announced that the Bengaluru-Chennai Expressway will be inaugurated…

3 days ago

Delhi Gurgaon Expressway Route, Map, Toll and More

The Delhi Gurgaon Expressway opened in 2008 and became a major transportation threat between Delhi…

3 days ago

Darbhanga Anand Vihar Amrit Bharat Express Ticket Fares, Stations and More

Railway officials said that these trains have aerodynamic engines. Amrit Bharat Express has attractive brown…

3 days ago

Surat Outer Ring Road: Phase 2 Set to Begin After Diwali

The outer ring road being built around Surat was planned to have 27.77 km of…

3 days ago